万家丽路(中意路~芙蓉南路)道路工程,长沙/市政
项目概况:长沙市万家丽路(中意路-芙蓉南路)道路工程位于湖南省长沙市天心区,采用城市主干路标准设计,双向六车道,设计速度为60km/h,路线全长1.884km,规划红线宽66m。道路横断面布置:4.5m(人行道)+7.5m(3.5m(非机动车道)+4.0m(公交专用道))+4.0m(侧绿化带)+12.0m(主路机动车道)+10.0m(中央分隔带)+12.0m(主路机动车道)+4.0m(侧绿化带)+7.5m(4.0m(公交专用道)+3.5m(非机动车道))+4.5m(人行道)=66.0m。万家丽路(中意路~芙蓉南路)工程,城市主干路(远期为快速路),路线全长1.884km,红线宽度66m,主线双六、辅道双四布置,主道60km/h,辅道30km/h,沿线经过尚双塘车辆段、地铁1号线高架段。
Project Overview: The Wanjiali Road (Zhongyi Road Furong South Road) Road Project in Changsha City, Hunan Province is located in Tianxin District, Changsha City. It adopts the standard design of urban trunk roads, with six lanes in both directions, a design speed of 60km/h, a total length of 1.884km, and a planned red line width of 66m. Cross section layout of the road: 4.5m (sidewalk)+7.5m (3.5m (non motorized lane)+4.0m (bus lane))+4.0m (side green belt)+12.0m (main motorized lane)+10.0m (central divider)+12.0m (main motorized lane)+4.0m (side green belt)+7.5m (4.0m (bus lane)+3.5m (non motorized lane))+4.5m (sidewalk)=66.0m. The Wanjiali Road (Zhongyi Road to Furong South Road) project is an urban main road (which will be an expressway in the long term) with a total length of 1.884km and a red line width of 66m. The main road is arranged in double six and auxiliary road is arranged in double four, with the main road at 60km/h and auxiliary road at 30km/h. The route passes through the Shangshuangtang Depot and the elevated section of Metro Line 1.

技术难度
难点一:道路纵断面:主线与南侧轨道尚双塘车辆段高差24m,同时要与北侧工业地块相衔接(高低路幅纵断方案)
难点二:道路横断面:须考虑南半幅尚双塘车辆段的建设,北侧需考虑工业用地单位的需要,在车辆段布置高低路幅。
Technical difficulty
Difficulty 1: Road profile: The height difference between the main line and the southern track of Shangshuangtang Depot is 24m, and it should also be connected to the northern industrial plot (high and low road width longitudinal section plan)
Difficulty 2: Road cross-section: It is necessary to consider the construction of the southern half of Shangshuangtang Depot, while the northern side needs to consider the needs of industrial land units and arrange high and low road sections in the depot.

复杂程度及影响程度
调整万家丽路规划标高:南、北车道分离,南北两幅标高分别根据两侧用地在规划标高基础上适当上调。
Complexity and impact level
Adjust the planned elevation of Wanjiali Road: the south and north lanes are separated, and the north and south elevations are adjusted appropriately based on the planned elevation of the land on both sides.

由于道路南半幅标高为了满足车辆段边坡的需要,标高在规划的基础上最大上调6m,而北半幅标高考虑到北侧用地的限制,上调有限,使道路南北两幅高差为4.5m。
Due to the fact that the elevation of the southern half of the road is increased by a maximum of 6 meters on the basis of planning to meet the needs of the vehicle depot slope, while the elevation of the northern half is limited due to the limitation of land use on the north side, resulting in a height difference of 4.5 meters between the north and south sides of the road.

该方案减少万家丽路土石挖方量;对车辆段场内标高及护壁桩按原设计影响相对较小,对车辆段的的工程造价及工期影响小。同时北半幅标高只在规划标高基础上局部做适当调整,最大调高2m,对道路北侧地块厂区的标高影响小,保证北侧已建厂房的进出,对开发商基本上不造成经济损失。
This plan reduces the amount of earthwork excavation on Wanjiali Road; The impact on the elevation and retaining piles in the depot according to the original design is relatively small, and the impact on the engineering cost and construction period of the depot is relatively small. At the same time, the elevation of the northern half of the road is only partially adjusted based on the planned elevation, with a maximum elevation of 2 meters. This has little impact on the elevation of the factory area on the north side of the road, ensuring the entry and exit of the existing factory building on the north side, and basically not causing economic losses to the developer.


项目名称:长沙市万家丽路(中意路~芙蓉南路)道路工程
项目类别:市政道路
项目位置:湖南省长沙市天心区
项目获奖:2021年度湖南省优秀工程勘察设计奖市政公用工程设计项目三等奖
项目规模:本项目路线全长1.884kn,红线宽度66m,主线双六、辅道双四布置,主道60Mkm/h,辅道30km/h,沿线经过尚双塘车辆段、地铁Ⅰ号线高架段。
总投资:53801.65万元
Project Name: Changsha Wanjiali Road (Zhongyi Road to Furong South Road) Road Engineering
Project category: Municipal roads
Project location: Tianxin District, Changsha City, Hunan Province
Project Award: Third Prize of 2021 Hunan Province Excellent Engineering Survey and Design Award for Municipal Public Engineering Design Project
Project scale: The total length of the project route is 1.884kn, with a red line width of 66m. The main line is arranged in double six and auxiliary roads are arranged in double four. The main road is 60Mkm/h, and the auxiliary road is 30km/h. The route passes through the Shangshuangtang Depot and the elevated section of Metro Line I.
Total investment: 538016500 yuan