重庆两江新区龙兴住宅项目智能化工程,重庆/建筑
项目概况
重庆两江新区龙兴住宅项目(H83-1、H84-1、H85-1、H86-1地块)智能化工程位于龙兴镇御临河公园区域,建筑面积约312975m²,其中地上建筑面积222490m²。
Project Overview
The intelligent project of Longxing Residential Project (H83-1, H84-1, H85-1 and H86-1) is located in the Linhe Park area of Longxing Town, with a construction area of about 312975m², of which the above-ground construction area is 222490m².
由四个地块H83-1、H84-1、H85-1、H86-1组成,是涉及高层、洋房、别墅、商业门市以及幼儿园一体的大型楼盘。
It is composed of four plots H83-1, H84-1, H85-1 and H86-1, which is a large building involving high-rise buildings, foreign houses, villas, commercial outlets and kindergartens.

新技术应用情况,Application situation of new technologies
基于BIM的管线综合技术
采用建筑业十项新技术第六项机电安装工程技术6.1基于BIM的管线综合技术,BIM技术对工程项目施工工艺新技术、节点优化等进行三维模拟,检查设计缺陷、进行设计优化,方案实景分析,感性技术交底,对施工效率和工程质量有较大提升。
Pipeline synthesis technology based on BIM
Using construction ten new technology sixth mechanical and electrical installation engineering technology 6.1 based on BIM pipeline technology, BIM technology for engineering project construction technology, node optimization, check design defects, design optimization, scheme analysis, perceptual technology disclosure, the construction efficiency and engineering quality have larger promotion.
导线连接器应用技术
采用建筑业十项新技术第六项机电安装工程技术6.2导线连接器应用技术,本工程采用的“PCT导线连接器”为无螺纹型连接器,无螺纹型连接器直接或间接通过弹簧、锲块或类似物等组成的无螺纹型夹紧部件,对被连接导线产生接触力,实现电气连接。确保导线连接所必须的电气连续、机械强度、保护措施以及检测维护4项基本要求。
Lead connector application technology
Using construction ten new technology item 6 mechanical and electrical installation engineering technology 6.2 wire connector application technology, the project used "PCT wire connector" for the no threaded type connector, no thread type connector directly or indirectly through the spring, the block or similar of no thread type clamping parts, is connected wire contact force, electrical connection. Ensure the four basic electrical continuity, mechanical strength, protection measures and inspection and maintenance requirements necessary for wire connection.

项目获奖,Project award