[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"website-menu-v8":3,"cases-info-518":233,"website-data":290,"details-case-recommend":313,"cases-list-right":346},[4,12,42,70,107,111,115,135,147,158,213],{"id":5,"pid":6,"name":7,"title":8,"icon":9,"weigh":5,"status":10,"ismenu":11},83,82,"/","首页","","normal",1,{"id":13,"pid":6,"name":14,"title":15,"icon":9,"weigh":13,"status":10,"ismenu":11,"children":16},84,"/cases","项目案例",[17,21,25,29,33,37],{"id":18,"pid":13,"name":19,"title":20,"icon":9,"weigh":18,"status":10,"ismenu":11},85,"/cases/8","规划设计",{"id":22,"pid":13,"name":23,"title":24,"icon":9,"weigh":22,"status":10,"ismenu":11},86,"/cases/9","建筑设计",{"id":26,"pid":13,"name":27,"title":28,"icon":9,"weigh":26,"status":10,"ismenu":11},87,"/cases/10","景观设计",{"id":30,"pid":13,"name":31,"title":32,"icon":9,"weigh":30,"status":10,"ismenu":11},88,"/cases/11","室内设计",{"id":34,"pid":13,"name":35,"title":36,"icon":9,"weigh":34,"status":10,"ismenu":11},91,"/cases/76","市政设计",{"id":38,"pid":13,"name":39,"title":40,"icon":9,"weigh":41,"status":10,"ismenu":11},90,"/cases/67","其他设计",92,{"id":41,"pid":6,"name":43,"title":44,"icon":9,"weigh":41,"status":10,"ismenu":11,"children":45},"/designer","人员专辑",[46,50,54,58,62,66],{"id":47,"pid":41,"name":48,"title":49,"icon":9,"weigh":47,"status":10,"ismenu":11},89,"/designer/3","咨询人员",{"id":51,"pid":41,"name":52,"title":53,"icon":9,"weigh":51,"status":10,"ismenu":11},93,"/designer/2","设计人员",{"id":55,"pid":41,"name":56,"title":57,"icon":9,"weigh":55,"status":10,"ismenu":11},94,"/designer/4","建筑业人员",{"id":59,"pid":41,"name":60,"title":61,"icon":9,"weigh":59,"status":10,"ismenu":11},95,"/designer/1","勘察人员",{"id":63,"pid":41,"name":64,"title":65,"icon":9,"weigh":63,"status":10,"ismenu":11},96,"/designer/65","监理人员",{"id":67,"pid":41,"name":68,"title":69,"icon":9,"weigh":67,"status":10,"ismenu":11},97,"/designer/63","其他人员",{"id":71,"pid":6,"name":72,"title":73,"icon":9,"weigh":71,"status":10,"ismenu":11,"children":74},98,"/agency","品牌机构",[75,79,83,87,91,95,99,103],{"id":76,"pid":71,"name":77,"title":78,"icon":9,"weigh":76,"status":10,"ismenu":11},99,"/agency/70","勘察企业",{"id":80,"pid":71,"name":81,"title":82,"icon":9,"weigh":80,"status":10,"ismenu":11},100,"/agency/2","咨询企业",{"id":84,"pid":71,"name":85,"title":86,"icon":9,"weigh":84,"status":10,"ismenu":11},101,"/agency/3","设计企业",{"id":88,"pid":71,"name":89,"title":90,"icon":9,"weigh":88,"status":10,"ismenu":11},102,"/agency/4","建筑业企业",{"id":92,"pid":71,"name":93,"title":94,"icon":9,"weigh":92,"status":10,"ismenu":11},103,"/agency/71","监理企业",{"id":96,"pid":71,"name":97,"title":98,"icon":9,"weigh":96,"status":10,"ismenu":11},104,"/agency/72","设计与施工一体化企业",{"id":100,"pid":71,"name":101,"title":102,"icon":9,"weigh":100,"status":10,"ismenu":11},105,"/agency/73","其他技术专业",{"id":104,"pid":71,"name":105,"title":106,"icon":9,"weigh":104,"status":10,"ismenu":11},106,"/agency/103","其他配套服务企业",{"id":108,"pid":6,"name":109,"title":110,"icon":9,"weigh":108,"status":10,"ismenu":11},107,"/certificate","企业资质",{"id":112,"pid":6,"name":113,"title":114,"icon":9,"weigh":112,"status":10,"ismenu":11},108,"/invite","项目导航",{"id":116,"pid":6,"name":117,"title":118,"icon":9,"weigh":116,"status":10,"ismenu":11,"children":119},109,"/prizecase","项目获奖",[120,123,127,131],{"id":121,"pid":116,"name":117,"title":122,"icon":9,"weigh":121,"status":10,"ismenu":11},110,"获奖案例",{"id":124,"pid":116,"name":125,"title":126,"icon":9,"weigh":124,"status":10,"ismenu":11},111,"/guide/210","获奖指南",{"id":128,"pid":116,"name":129,"title":130,"icon":9,"weigh":128,"status":10,"ismenu":11},112,"/association","协会组织",{"id":132,"pid":116,"name":133,"title":134,"icon":9,"weigh":132,"status":10,"ismenu":11},113,"/news","新闻资讯",{"id":136,"pid":6,"name":9,"title":137,"icon":9,"weigh":136,"status":10,"ismenu":11,"children":138},114,"求职招聘",[139,143],{"id":140,"pid":136,"name":141,"title":142,"icon":9,"weigh":140,"status":10,"ismenu":11},115,"/resume","我是招聘员，查看所有精英人才",{"id":144,"pid":136,"name":145,"title":146,"icon":9,"weigh":144,"status":10,"ismenu":11},116,"/recruit","我是求职者，查看所有热门工作",{"id":148,"pid":6,"name":149,"title":150,"icon":9,"weigh":148,"status":10,"ismenu":11,"children":151},117,"/device","设备建材",[152,154],{"id":153,"pid":148,"name":149,"title":150,"icon":9,"weigh":153,"status":10,"ismenu":11},118,{"id":155,"pid":148,"name":156,"title":157,"icon":9,"weigh":155,"status":10,"ismenu":11},119,"/special","特价建材",{"id":159,"pid":6,"name":160,"title":161,"icon":9,"weigh":159,"status":10,"ismenu":11,"children":162},120,"/innovation","高新科创",[163,168,173,177,180,183,186,189,192,195,198,201,204,207,210],{"id":164,"pid":159,"name":165,"title":166,"icon":9,"weigh":167,"status":10,"ismenu":11},125,"/innovation/42","国家高新技术企业",121,{"id":169,"pid":159,"name":170,"title":171,"icon":9,"weigh":172,"status":10,"ismenu":11},124,"/innovation/41","中关村高新技术企业",122,{"id":174,"pid":159,"name":175,"title":176,"icon":9,"weigh":174,"status":10,"ismenu":11},123,"/innovation/40","  科技型中小企业",{"id":172,"pid":159,"name":178,"title":179,"icon":9,"weigh":169,"status":10,"ismenu":11},"/innovation/39","创新型中小企业",{"id":167,"pid":159,"name":181,"title":182,"icon":9,"weigh":164,"status":10,"ismenu":11},"/innovation/38","专精特新中小企业",{"id":184,"pid":159,"name":9,"title":185,"icon":9,"weigh":184,"status":10,"ismenu":11},169,"专精特新小巨人",{"id":187,"pid":159,"name":9,"title":188,"icon":9,"weigh":187,"status":10,"ismenu":11},170,"独角兽",{"id":190,"pid":159,"name":9,"title":191,"icon":9,"weigh":190,"status":10,"ismenu":11},171,"民营科技企业",{"id":193,"pid":159,"name":9,"title":194,"icon":9,"weigh":193,"status":10,"ismenu":11},172,"制造业单项冠军企业",{"id":196,"pid":159,"name":9,"title":197,"icon":9,"weigh":196,"status":10,"ismenu":11},173,"技术创新示范企业",{"id":199,"pid":159,"name":9,"title":200,"icon":9,"weigh":199,"status":10,"ismenu":11},174,"工程技术研究中心",{"id":202,"pid":159,"name":9,"title":203,"icon":9,"weigh":202,"status":10,"ismenu":11},175,"国家重点实验室",{"id":205,"pid":159,"name":9,"title":206,"icon":9,"weigh":205,"status":10,"ismenu":11},176,"瞪羚企业",{"id":208,"pid":159,"name":9,"title":209,"icon":9,"weigh":208,"status":10,"ismenu":11},177,"牛羚企业",{"id":211,"pid":159,"name":9,"title":212,"icon":9,"weigh":211,"status":10,"ismenu":11},178,"雏鹰企业",{"id":214,"pid":6,"name":9,"title":215,"icon":9,"weigh":214,"status":10,"ismenu":11,"children":216},126,"邀约合作",[217,221,225,229],{"id":218,"pid":214,"name":219,"title":220,"icon":9,"weigh":218,"status":10,"ismenu":11},127,"/cooperation/1","项目邀约",{"id":222,"pid":214,"name":223,"title":224,"icon":9,"weigh":222,"status":10,"ismenu":11},128,"/cooperation/2","项目合作",{"id":226,"pid":214,"name":227,"title":228,"icon":9,"weigh":226,"status":10,"ismenu":11},129,"/cooperation/14","资源对接",{"id":230,"pid":214,"name":231,"title":232,"icon":9,"weigh":230,"status":10,"ismenu":11},130,"/cooperation/4","新品推荐",{"info":234,"up":282,"down":286},{"id":235,"name":236,"name_md5":237,"joint_designer_ids":9,"prize_id":238,"prize_desc":9,"prize1":9,"prize2":9,"prize3":9,"designer_id":239,"cases_classify_pid":240,"cases_classify_id":241,"cases_architecture_id":11,"cases_style_id":11,"content":242,"content_imgs":243,"cover":244,"recommend_status":11,"tags":245,"collect_num":238,"is_white_list":11,"province":274,"city":275,"create_time":276,"update_time":277,"visit":238,"description":243,"keyword":243,"cases_architecture":278,"cases_style":279,"cases_classify":280},518,"北京城市副中心行政办公区项目，北京/建筑设计","4c5005c210c06fec6da59e6c960094e0",0,81,9,36,"\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cspan style=\"background-color: #ffffff;\">▼ \u003C/span>北京城市副中心行政办公区整体效果图，\u003C/span>\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Overall renderings of Beijing Urban sub center administrative office area\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220818/202208181016198327xOnQ4iRHypjXUi.jpeg\" width=\"1080\" height=\"583\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">一、项目概况\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1.项目基本信息\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">北京城市副中心行政办公区位于北京市通州区潞城镇。该项目以办公楼为主，由A、B、C、D等片区组成。项目由北京市城市副中心行政办公区工程建设办公室（简称工程办）代表市委市政府作为业主，对多项目施工过程实行统一监管，施工总包单位分别为北京城建集团、北京建工集团、北京住总集团、中建一局。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1、 Project overview\u003C/span>\u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1. Basic information of the project\u003C/span>\u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">The administrative office area of Beijing Urban sub center is located in Lucheng Town, Tongzhou District, Beijing. The project is dominated by office buildings and consists of areas a, B, C and D. The project is under the unified supervision of the construction process of multiple projects on behalf of the municipal Party committee and the municipal government. The general contracting units of the construction are Beijing Urban Construction Group, Beijing Construction Engineering Group, Beijing housing construction group and China Construction First Bureau.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2.项目难点\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）体量大，工期紧：以A1项目为例，单项目达到地下结构61个流水段, 需要92天完成全部主体结构，即使在冬季也要达到地上结构“四天一层”的建设速度。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）图纸变更多，版本统一更新难：工程浩大，结构复杂，专业繁多，图纸变更非常频繁。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）专业分包多，统一协调管控难度大：参与单位多、配合难度极大，单项目达到35个分包工程单位，机电专业齐全，管线排布难度大，预留预埋多，总承包管理、协调工作量大。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（4）超高超大空间多，弧形斜屋面节点复杂：A1项目斜弧形屋面为41°大倾角，160m超长40.5m超高6300㎡超大的主体结构全部在冬季施工；另外有20处超限结构，对模架搭设有着很高的要求。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2. Project difficulties\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) Large volume and tight construction period: Taking A1 project as an example, it takes 92 days to complete all the main structures for a single project to reach 61 flow sections of the underground structure. Even in winter, it is necessary to reach the construction speed of \"four days and one floor\" of the above ground structure.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) There are many changes in drawings, and it is difficult to update the version uniformly: the project is huge, the structure is complex, there are many specialties, and the drawing changes are very frequent.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) There are many professional subcontracts, and it is difficult to unify, coordinate and control: there are many participating units, and it is very difficult to cooperate. There are 35 subcontracted engineering units for a single project. The electromechanical disciplines are complete, the pipeline layout is difficult, there are many reservations and embedments, and the workload of general contracting management and coordination is large.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(4) There are many super high and super large spaces, and the nodes of arc inclined roof are complex: the inclined arc roof of A1 project has a 41 ° large inclination angle, 160m super length of 40.5M, super height of 6300m2, and all the super large main structures are constructed in winter; In addition, there are 20 out of gauge structures, which have high requirements for formwork erection.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/2022030917082486720V4IuWxUhqybsn.jpg\" alt=\"\" width=\"966\" height=\"567\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/202203091704254950a0okME2Hi4q3iB.jpeg\" width=\"966\" height=\"657\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">3.应用目标\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">为了实现保工期、保安全、保质量的目的，本项目应用中确定了如下四个目标：\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）技术管理目标：根据项目特点进行施工部署和技术质量控制；根据技术交底时需要注意的项目中难点细节、多造型钢结构的精准安装等制定相应技术方案；对于项目协同管理及现场施工管理等制定管理机制。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）人才培养目标：培养BIM建模人才，能够独立建立土建、机电、装修等专业模型；培养BIM管理人才，能够协调项目参与各方事务，通过平台实现协同管理。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）方法论总结与验证：首先实现制度建设标准化，包括管理制度标准和信息使用制度标准；其次实现信息资源标准化，规范各系统产生的数据，包括BIM数据、视频数据、图像数据、文字数据、图纸数据等；第三实现流程标准化，统一技术执行动作。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（4）新技术应用探索目标：采用“互联网+”为代表的信息化手段，探索甲方多项目智慧监管平台，对多项目进度、设计、质量、安全、劳务、物资等集中监管；并且实现基于现场数据的统计分析，从而进一步提升工程监管能力。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">3. Application objectives\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">In order to ensure the construction period, safety and quality, the following four objectives are determined in the application of the project:\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) Technical management objectives: carry out construction deployment and technical quality control according to the characteristics of the project; Formulate corresponding technical schemes according to the difficult details of the project that need to be paid attention to during technical disclosure and the accurate installation of multi shape steel structure; Formulate management mechanism for project coordination management and on-site construction management.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) Talent training objectives: cultivate BIM modeling talents and be able to independently establish professional models such as civil engineering, electromechanical and decoration; Cultivate BIM management talents, be able to coordinate the affairs of all parties involved in the project, and realize collaborative management through the platform.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) Summary and verification of methodology: firstly, realize the standardization of system construction, including management system standards and information use system standards; Secondly, realize the standardization of information resources and standardize the data generated by each system, including BIM data, video data, image data, text data, drawing data, etc; Third, standardize the process and unify the technical execution actions.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(4) the goal of new technology application and exploration: to use the \"Internet plus\" as the means of information, to explore the multi party intelligent supervision platform of Party A, and to centrally supervise the progress, design, quality, safety, labor and materials of many projects. And realize statistical analysis based on field data, so as to further improve the ability of project supervision.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">二、BIM应用方案\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1.BIM应用内容\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）通过利用BIM技术，实现三维施工场地布置及立体施工规划，解决项目工期紧、现场平面布置难度大的困难。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）通过Revit，MagiCAD等软件创建出建筑结构，暖通、电气、给排水等专业的三维模型，并且进行碰撞检查，解决项目图纸变更频繁、碰撞多的问题。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）利用BIM可视性特点进行施工方案模拟，对于复杂节点实现直观精确的施工方案交底。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（4）利用BIM5D软件实现流水段划分与进度计划关联，通过进度模拟直观表达施工进度，实现对项目进度的控制，保证项目能按时竣工。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（5）利用BIM+云技术解决施工过程产生的资料多，统一协调管控难度大的问题。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2、 BIM application scheme\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1. BIM application content\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) Through the use of BIM Technology, realize the three-dimensional construction site layout and three-dimensional construction planning, and solve the difficulties of tight project construction period and difficult on-site plane layout.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) Through Revit, magicad and other software, the three-dimensional models of building structure, HVAC, electrical, water supply and drainage and other disciplines are created, and the collision inspection is carried out to solve the problems of frequent changes and frequent collisions of project drawings.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) Use the visibility characteristics of BIM to simulate the construction scheme and realize intuitive and accurate construction scheme disclosure for complex nodes.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(4) Bim5d software is used to realize the correlation between flow section division and schedule, and visually express the construction progress through schedule simulation, so as to control the project progress and ensure the completion of the project on time.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(5) BIM + cloud technology is used to solve the problems of many data generated in the construction process and difficult unified coordination and control.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2.BIM应用策划\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）软件配置\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">为满足建模要求，各个项目部采购Revit、Tekla、ArchiCAD、广联达MagiCAD等建模软件；为实现BIM协同管理，采购了广联达BIM5D等软件。通过各专业BIM软件的合理选型，确保建模准确、整合完善、应用顺畅。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">2. BIM application planning\u003C/span>\u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">(1) Software configuration\u003C/span>\u003C/p>\n\u003Cp style=\"text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">In order to meet the modeling requirements, each project department purchases Revit, Tekla, Archicad, Guanglianda magicad and other modeling software; In order to realize BIM collaborative management, Guanglianda bim5d and other software are purchased. Through the reasonable selection of BIM software of various disciplines, ensure accurate modeling, perfect integration and smooth application.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220818/202208181021425421vkdpmd0VSbKTrb.jpeg\" width=\"1200\" height=\"770\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）组织架构与分工\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1）甲方代表为副中心行政办公区工程建设办公室，对多项目施工过程实行统一监管，负责确定BIM应用目标，统筹协调项目BIM应用资源。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2）施工总包单位分别为北京城建集团、北京建工集团、北京住总集团、中建一局集团有限公司。每个施工总包承建多个标段，总包下设立BIM中心，配置各专业BIM建模人员、BIM平台管理人员等。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">3）广联达科技股份有限公司作为其中之一的软件支撑单位，协助各个总包项目部进行相应软件应用培训以及BIM的后期应用推进。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">4）所有进场的专业分包单位，配有专业BIM技术人员，负责配合总包单位的BIM实施。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) Organizational structure and division of labor\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1) The representative of Party A is the engineering construction office in the administrative office area of the sub center, which implements unified supervision over the construction process of multiple projects, is responsible for determining the BIM application objectives and coordinating the BIM application resources of the project.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2) The construction general contracting units are Beijing Urban Construction Group, Beijing Construction Engineering Group, Beijing housing group and China Construction First Bureau Group Co., Ltd. Each construction general contractor undertakes multiple bid sections, and a BIM center is set up under the general contractor, which is equipped with professional BIM modelers, BIM platform managers, etc.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">3) GuangLianda Technology Co., Ltd., as one of the software support units, assists each EPC project department in conducting corresponding software application training and promoting the later application of BIM.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">4) All professional subcontractors entering the site are equipped with professional BIM technicians who are responsible for cooperating with the general contractor in BIM implementation.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）应用顺序\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">首先确定以副中心工程办统一监管，各参建方共同参与的协同管理组织；其次各项目根据需要采购所需软件以及设备，培养BIM人才；再次制定双周例会制度和责任到人制度保证应用点的顺利进行。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) Application sequence\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">First, determine the collaborative management organization with the unified supervision of the Engineering Office of the sub center and the participation of all participants; Secondly, each project purchases the required software and equipment according to the needs, and trains BIM talents; Thirdly, formulate the biweekly regular meeting system and responsibility to person system to ensure the smooth progress of the application point.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">三、BIM实施过程\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1.BIM应用准备\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）制定例会制度\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">工程办制定严格的双周例会制度，同时规定各个项目做到BIM应用模块责任到人，这样甲方和施工方定期汇总推进情况，及时交流应用过程存在问题并且及时讨论解决方案，从而有效保障各参建方BIM每个模块的落地应用和顺利推进。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）进行软件培训\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">各个施工总包组织系统的培训，针对于Revit、Navisworks、Magicad、Fuzor、Lumion、BIM5D等专业应用软件进行操作培训。通过培训培养出很多掌握BIM技术的建模人才和协调管理人才。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）模型创建\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">基于BIM技术进行建筑模型、结构模型、机电模型、钢结构模型、幕墙模型、等的创建工作，为后续BIM应用打下基础。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">3、 BIM implementation process\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">1. BIM application preparation\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">(1) Formulate regular meeting system\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">The engineering office formulates a strict biweekly regular meeting system, and stipulates that each project should be responsible for the BIM Application module. In this way, Party A and the construction party regularly summarize the progress, timely exchange the problems existing in the application process and timely discuss the solutions, so as to effectively ensure the landing application and smooth progress of each BIM module of each participant.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">(2) Conduct software training\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">The training of each construction general contractor organization system is aimed at the operation training of professional application software such as Revit, NavisWorks, magicad, fuzor, lumion and bim5d. Through training, many modeling talents and coordination management talents who master BIM Technology have been trained.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">(3) Model creation\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px; color: #999999;\">Building model, structural model, electromechanical model, steel structure model, curtain wall model, etc. are created based on BIM Technology, so as to lay a foundation for subsequent BIM application.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2.BIM应用过程\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1） 三维场布：通过利用BIM技术，实现三维施工场地布置及立体施工规划，提前检查施工过程中的各种安全隐患，规避在施工过程中出现的各种问题，实现提前发现问题，消灭隐患，为项目的合理实施创造良好条件。很好的减少了材料运输、大型机械进出场等二次搬运的困难。解决了项目工期紧、现场平面布置难度大的问题。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2. BIM application process\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) Three dimensional site layout: through the use of BIM Technology, realize the three-dimensional construction site layout and three-dimensional construction planning, check various potential safety hazards in the construction process in advance, avoid various problems in the construction process, find problems in advance, eliminate hidden dangers, and create good conditions for the rational implementation of the project. The difficulty of secondary handling such as material transportation and large machinery entering and leaving the site is well reduced. It solves the problems of tight project duration and difficult site layout.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cspan style=\"background-color: #ffffff;\">▼\u003C/span>\u003Cspan style=\"background-color: #ffffff;\"> \u003C/span>三维场布，\u003C/span>\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">3D field layout\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/202203091722380939B3rzXOVJJnZDxd.jpeg\" width=\"966\" height=\"553\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2） 碰撞检查：利用Revit，MagiCAD等软件创建出建筑结构、暖通、电气、给排水等专业的三维模型，会同各专业工程师进行优化讨论。根据碰撞检测报告，出具模型调整优化方案，以调整优化模型并达到施工要求。尤其是对关键部位和关键管道进行预排布，经各方评审和论证后再根据最优方案，创建实体三维模型，避免了后续返工的风险。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) Discuss with professional HVAC engineers to create 3D structural optimization models, such as HVAC and drainage, and use professional CAD software of Revit. According to the collision detection report, issue the model adjustment and optimization scheme to adjust and optimize the model and meet the construction requirements. In particular, the key parts and pipelines are pre arranged, and then the solid three-dimensional model is created according to the optimal scheme after review and demonstration by all parties, so as to avoid the risk of subsequent rework.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/202203091724200111wXmx4W9hUMaJx5.jpeg\" width=\"966\" height=\"634\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3） 预留洞口设置：传统作业中，机电管线预留洞都分散标注在各个专业图纸上，缺掉漏掉的情况很多，而且需要靠人力查找。同时过程中不能保证预留洞口的准确性，这使得后期现场作业杂乱，对后期收尾工作造成很大影响。利用MagiCAD软件预留洞口功能，能够快速、准确的在模型上生成预留洞口。避免了后期二次开洞，节约了工期以及人力和财力，改善了安全文明施工与环境。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) Setting of reserved holes: in the traditional operation, the reserved holes of electromechanical pipelines are marked on various professional drawings, which are missing and need to be found manually. At the same time, the accuracy of reserved openings cannot be guaranteed in the process, which makes the later field operation messy and has a great impact on the later finishing work. Using the reserved opening function of magicad software, the reserved opening can be generated on the model quickly and accurately. The secondary opening in the later stage is avoided, the construction period, manpower and financial resources are saved, and the safe and civilized construction and environment are improved.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/202203091725093367bQwXNIROKSvSV0.jpeg\" width=\"966\" height=\"583\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（4） 施工方案模拟：利用BIM可视性特点进行施工方案的模拟，使斜屋架细部节点立体直观展示，实现直观精确的施工方案交底。同时通过各施工步骤效果图及施工动画，使施工人员更为直观的理解交底意图，提高了交底效率和理解准确性，为后期施工质量提供了很好的保障。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（5） 进度管控：本工程A1项目地下结构61个流水段，地上结构39个流水段，流水段划分众多，专业交叉频繁，加之变更频繁、工期紧张。若是生产计划安排不合理，将会对整体工程进度造成影响。项目利用BIM5D软件实现流水段划分与进度计划关联，通过进度模拟直观表达施工进度。并通过计划进度与实际进度进行对比，及时分析偏差对工期的影响以及产生原因，大大提升方案比对效率，方便指导管理者采取有效措施完成对项目进度的控制，保证项目按时竣工。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（6） 自动排砖：项目工期紧，体量大，几乎拿不出时间进行传统CAD排砖。利用BIM5D自动排砖功能，统一设置好相关参数自动排砖，同时添加构造柱、圈梁、洞口等相关信息，在此基础上再进行精细化排砖，对细节进行精细化调整。应用过程中提高了效率10倍左右，控量节省约3%。同时提高了施工技术质量，减少二次搬运，使工程在技术上有了大幅度提升。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(4) Simulation of construction scheme: use the visibility characteristics of BIM to simulate the construction scheme, so that the detailed nodes of inclined roof truss can be displayed in a three-dimensional and intuitive manner, and realize the intuitive and accurate disclosure of construction scheme. At the same time, through the effect drawing and construction animation of each construction step, the construction personnel can more intuitively understand the disclosure intention, improve the disclosure efficiency and accuracy, and provide a good guarantee for the later construction quality.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(5) Progress control: there are 61 flow sections in the underground structure and 39 flow sections in the aboveground structure of A1 project of the project. There are many flow sections, frequent cross disciplines, frequent changes and tight construction period. If the production plan is unreasonable, it will affect the overall project progress. The project uses bim5d software to realize the correlation between flow section division and schedule, and visually express the construction progress through schedule simulation. Through the comparison between the planned progress and the actual progress, timely analyze the impact of the deviation on the construction period and the causes, greatly improve the efficiency of scheme comparison, facilitate the guidance of managers to take effective measures to complete the control of the project progress and ensure the timely completion of the project.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(6) Automatic brick laying: due to the tight construction period and large volume of the project, it is almost impossible to take time for traditional CAD brick laying. Using the bim5d automatic brick layout function, set relevant parameters uniformly, and automatically arrange bricks. At the same time, add relevant information such as structural column, ring beam and opening. On this basis, carry out fine brick layout and fine adjustment of details. In the process of application, the efficiency is improved by about 10 times, and the quantity control is saved by about 3%. At the same time, it improves the quality of construction technology, reduces secondary handling, and greatly improves the technology of the project.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cspan style=\"background-color: #ffffff;\">▼\u003C/span>\u003Cspan style=\"background-color: #ffffff;\"> \u003C/span>现场排砖效果，\u003C/span>\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">On site brick laying effect\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220818/202208181020300562mOdLgw72jLnY5x.jpeg\" width=\"1168\" height=\"237\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（7） 资料协同：施工过程产生的资料多如牛毛，这对项目的资料管理能力提出了更高的要求。传统模式资料管理动作滞后，很多资料都是后补的，而且缺乏有效的结构化管理，数据真实性、及时性均无法保障。利用BIM+云技术可实现将工程资料上传到云端，并进行结构化梳理，让资料归有所属如：图纸、技术安全资料、会议纪要等，可随时调用查看，数据永久保存不遗失。项目部日常管理资料也可实现实时上传存储，不但提升了项目的资料管理能力，也做到了数据留痕与有效协同，大大提升了各个项目管理的效率和水平。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（8） 质量安全：本项目参与单位众多，体量巨大，项目的质量安全隐患众多。按照传统模式，质量安全问题管理闭环耗时长，且需要有专人进行催促管理。而且由于缺少数据留痕，也造成后续管理的困难，容易出现扯皮的现象发生。利用BIM技术，现场管理人员发现质量安全问题，用手机端拍摄照片并描述问题，通过权限的设置上传发现的问题至云端，使得所有相关人员均可以看到实时信息。数据还可实现及时存储与汇总分析，归纳问题出现的类型和出现的概率。管理层及时查看项目质量安全情况汇总信息，对项目的决策和管理提供强有力的数据支撑，将项目的整体管理水平提升至一个新的高度。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（9） 智慧工程管理平台：慧监管平台建设不仅仅是技术范畴，更多的需要与实际的管理流程、现场管理方式相匹配。本着一个平台，集中掌控的思路，平台服务于建设指挥部，满足指挥部服对上汇报、对下管控、平级交流的需求，平台整体框架面向不同用户分成三层：\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">应用层是总包各项目部现场使用系统，包括BIM5D管理系统、现场劳务管理系统、现场物资管理系统、机械设备管理系统、技术质量管理系统、生产安全管理系统。这些系统充分利用RFID、电子标签、测量器、传感器、摄像头、智能设备，实时监控、数据采集、智能感知，提高项目部工作效率的同时为上一层提供数据。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">管控层是核心，面向指挥部提供统一的监管平台，一方面通过统一数据标准将不同项目部的业务数据集成，另一方面建立进度、劳务、质量安全、智能监控等模块，实现施工过程中对各项目的进度、质量、人员等情况的实时监管。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">展示层主要实现对上汇报，将不同平台的模型、业务数据、视屏等集成展示在同一界面，以各种统计分析图标以及模型、视频等直观性方式展示整个区域施工状态。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(7) Data collaboration: there are many data generated in the construction process, which puts forward higher requirements for the data management ability of the project. The traditional mode of data management lags behind, many data are supplemented later, and there is a lack of effective structured management, so the authenticity and timeliness of data can not be guaranteed. BIM + cloud technology can be used to upload engineering data to the cloud and sort it out structurally, so that the data can belong to, such as drawings, technical safety data, meeting minutes, etc., which can be called and viewed at any time, and the data can be saved permanently. The daily management data of the project department can also be uploaded and stored in real time, which not only improves the data management ability of the project, but also achieves data trace and effective coordination, and greatly improves the efficiency and level of each project management.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(8) Quality and safety: there are many participating units of the project, with a huge volume, and there are many potential quality and safety hazards of the project. According to the traditional mode, the closed-loop management of quality and safety issues takes a long time, and special personnel are required to urge the management. Moreover, due to the lack of data, it also causes difficulties in follow-up management and is prone to wrangling. Using BIM Technology, on-site managers find quality and safety problems, take photos with mobile phones and describe the problems, and upload the problems found to the cloud through permission settings, so that all relevant personnel can see real-time information. The data can also be stored, summarized and analyzed in time to summarize the types and probability of problems. The management shall timely check the summary information of the project quality and safety, provide strong data support for the decision-making and management of the project, and raise the overall management level of the project to a new level.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(9) Smart engineering management platform: the construction of smart supervision platform is not only a technical category, but also needs to be matched with the actual management process and on-site management mode. Based on the idea of one platform and centralized control, the platform serves the construction headquarters and meets the needs of the headquarters for reporting to the upper level, controlling to the lower level and horizontal communication. The overall framework of the platform is divided into three layers for different users:\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">The application layer is the on-site use system of each project Department of the general contractor, including bim5d management system, on-site labor management system, on-site material management system, mechanical equipment management system, technical quality management system and production safety management system. These systems make full use of RFID, electronic tags, measuring devices, sensors, cameras and intelligent equipment to conduct real-time monitoring, data acquisition and intelligent perception, so as to improve the work efficiency of the project department and provide data for the upper layer at the same time.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">The management and control layer is the core and provides a unified supervision platform for the headquarters. On the one hand, it integrates the business data of different project departments through unified data standards. On the other hand, it establishes modules such as progress, labor, quality safety and intelligent monitoring to realize the real-time supervision of the progress, quality and personnel of each project during the construction process.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">The display layer mainly realizes the report to the upper level, integrates and displays the models, business data and video screens of different platforms on the same interface, and displays the construction status of the whole area in various statistical analysis icons, models, videos and other intuitive ways.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cspan style=\"background-color: #ffffff;\">▼\u003C/span>\u003Cspan style=\"background-color: #ffffff;\"> \u003C/span>智慧工程管理平台，\u003C/span>\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Intelligent engineering management platform\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220818/202208181020020464uoHU9w3zSCGl8I.jpeg\" width=\"966\" height=\"509\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">四、BIM应用总结\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1.项目实际应用问题的应用效果总结\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1）项目通过BIM三维建模、可视化交底，对关键部位进行质量把控。对工程量进行精细化计算，采用限额领料等措施，对超出的用量进行追根溯源。通过BIM技术应用，从成本、质量、工期等方面都得到了显著效果。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2）B1、B2工程通过各专业深化设计检查出碰撞检查点8129处，节省工期35天，减少成本损失750万元。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）A3、A4项目应用BIM技术后综合效果比目标值提高了约5个百分点。实现了结构施工84小时一层楼，累计节约成本近300万元。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（4）借助本项目BIM应用成果，各总包单位获得北京BIM应用标杆项目称号，同时在中国建设工程BIM大赛等各项比赛中获得优异成绩，并带动公司其他项目推广使用BIM技术。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">4、 BIM application summary\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1. Application effect summary of practical application problems of the project\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) The project carries out quality control on key parts through BIM three-dimensional modeling and visual disclosure. Carry out refined calculation on the quantities, adopt quota picking and other measures, and trace the source of the excess quantities. Through the application of BIM Technology, remarkable results have been obtained in terms of cost, quality and construction period.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) In B1 and B2 projects, 8129 collision checkpoints were checked through the in-depth design of various disciplines, saving 35 days of construction period and 7.5 million yuan of cost loss.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) After the application of BIM Technology in A3 and A4 projects, the comprehensive effect is about 5 percentage points higher than the target value. The structural construction of 84 hours and one floor has been realized, and the cumulative cost has been saved by nearly 3 million yuan.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(4) With the help of the BIM application achievements of the project, each general contractor won the title of Beijing BIM application Benchmarking Project, obtained excellent results in China Construction Engineering BIM competition and other competitions, and led the company to promote the use of BIM Technology in other projects.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">\u003Cimg src=\"https://www.iecwww.com/uploads/image/20220309/2022030917295480332hIQ9DUuQ3vlyb.jpeg\" width=\"966\" height=\"395\" />\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2.BIM应用方法总结\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（1） 制定BIM模型标准及管理方法：包括钢结构的建模标准、BIM模型管理标准、BIM技术应用实施方案、土建模型标准指南、BIM建模工作流程、机电建模标准指南、机电三维深化设计方案在内的相关技术标准。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（2） BIM人才培养：培养出能够独立建立土建、机电、装修等专业模型的BIM建模人才；培养出能够协调项目参与各方事务，通过平台实现项目协同管理的BIM管理人才。这样一批BIM应用骨干人员，为各总包后续项目的BIM推进积累了人才库。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">（3）各项目之间的管理协调实现了标准化：\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">1） 制度建设标准化：包括管理制度标准和信息使用制度标准，一是整个副中心项目部自身管理制度的标准化，明确管理流程、岗位职责，做到有法可依。二是信息化制度标准化，建立信息化培训和考核制度，保证信息化系统正常运行。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">2) 信息资源标准化：规范各系统产生的数据，包括BIM数据、视频数据、图像数据、文字数据、图纸数据等。一是统一项目分解结构、项目组织机构编码、文件编码与结构等基础性编码。二是建立业务数据标准和接口标准，支撑监管平台与项目部各业务系统的数据交换。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 16px;\">3) 流程标准化：统一技术执行动作，包括数据采集方法与硬件设备规格技术指标要求、网络传输信息共享要求、各级平台系统对接要求，BIM模型建立和使用要求等。\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\"> \u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2. Summary of BIM application methods\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(1) Formulate BIM model standards and management methods: relevant technical standards including steel structure modeling standards, BIM model management standards, BIM Technology Application implementation scheme, civil engineering model standard guide, BIM modeling workflow, electromechanical modeling standard guide, electromechanical 3D deepening design scheme.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(2) BIM talent training: cultivate BIM modeling talents who can independently establish professional models such as civil engineering, electromechanical and decoration; Cultivate BIM management talents who can coordinate the affairs of all parties involved in the project and realize project collaborative management through the platform. Such a group of BIM application backbone personnel have accumulated a talent pool for BIM promotion of follow-up projects of each general contractor.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">(3) The management coordination among various projects has been standardized:\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">1) Standardization of system construction: including management system standards and information use system standards. First, standardize the management system of the whole sub center project department, clarify the management process and post responsibilities, and ensure that there are laws to follow. Second, standardize the information system, establish the information training and assessment system, and ensure the normal operation of the information system.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">2) Standardization of information resources: standardize the data generated by each system, including BIM data, video data, image data, text data, drawing data, etc. First, unify basic codes such as project breakdown structure, project organization code, document code and structure. Second, establish business data standards and interface standards to support the data exchange between the supervision platform and the business systems of the project department.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2; text-align: justify;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">3) Process standardization: unified technical execution actions, including data acquisition methods and hardware equipment specifications, technical index requirements, network transmission information sharing requirements, platform system docking requirements at all levels, BIM model establishment and use requirements, etc.\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\"> \u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">项目信息\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">项目名称：北京城市副中心行政办公区项目\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">设计团队：北京市建筑设计研究院有限公司\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">文章分类：建筑设计-BIM设计\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">设计公司：北京市建筑设计研究院有限公司\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">项目地址：北京\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #333333; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif;\">项目规模：155平方公里\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\"> \u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Project information\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Project Name: Beijing sub center administrative office area project\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Design team: Beijing Architectural Design and Research Institute Co., Ltd\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Article category: Architectural Design BIM design\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Design company: Beijing Architectural Design and Research Institute Co., Ltd\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Project address: Beijing\u003C/span>\u003C/p>\n\u003Cp style=\"line-height: 2;\">\u003Cspan style=\"color: #999999; font-family: 'Microsoft YaHei', 'Helvetica Neue', 'PingFang SC', sans-serif; font-size: 14px;\">Project scale: 155 square kilometers\u003C/span>\u003C/p>",null,"https://www.iecwww.com/uploads/image/20220309/52227d1957411286431bb55dc9df7dd8.jpeg",[246,252,256,261,266,270],{"name":247,"icon":248,"url":9,"is_required":249,"tags":250,"type":251},"项目名称","fa-drivers-license-o","1","北京城市副中心行政办公区项目","2",{"name":253,"icon":254,"url":9,"is_required":249,"tags":255,"type":251},"设计团队","fa-group","北京市建筑设计研究院有限公司",{"name":257,"icon":258,"url":259,"is_required":249,"tags":260,"type":249},"文章分类","fa-file-text","https://www.iecwww.com/project/project_cases.html?cases_classify_pid=9&cases_classify_id=36","建筑设计-BIM设计",{"name":262,"icon":263,"url":264,"is_required":249,"tags":265,"type":249},"设计公司","fa-university","https://www.iecwww.com/agency/agencyInfo.html?agency_id=81","北京市建筑设计研究院有限公司 ",{"name":267,"icon":268,"url":9,"is_required":249,"tags":269,"type":251},"项目地址","fa-map-marker","北京",{"name":271,"icon":272,"url":9,"is_required":249,"tags":273,"type":251},"项目规模","fa-cubes","155平方公里","110000","110100","2022-03-09 17:42:40","2024-03-05 13:36:00","居住建筑","现代风格",[24,281],"BIM设计",{"id":283,"cover":284,"name":285},517,"https://www.iecwww.com/uploads/image/20220309/89f09f972850bfc69db94fe50b44a0a5.jpeg","塞纳托酒店屋顶，法国/室内设计",{"id":287,"cover":288,"name":289},519,"https://www.iecwww.com/uploads/image/20220309/f5342920c98d2da1f96b1623b92c3998.jpeg","ASSAS私人公寓，法国/室内设计",{"web_name":291,"web_company_name":292,"web_url":293,"web_copyright":294,"web_logo":295,"web_icp":296,"web_security":297,"contact_address":298,"contact_tel":299,"contact_email":300,"web_icp_url":301,"web_security_url":302,"seo_title":292,"seo_keywords":303,"seo_description":304,"web_work":305,"customer_service_name":306,"customer_service_face":307,"web_tbl":308,"web_tbl_url":309,"watermark_root":310,"watermark_position":311,"watermark_text":312},"IEC环境建设网","IEC国际环境建设","https://web.iec.zlxtbj.com","IEC国际环境建设 © 2012--2020 . 版权所有.北京华城远大国际城市规划产业发展股份有限公司","https://www.iecwww.com/uploads/image/20230904/27abd44fff635b810d443e3289a77982.png","京ICP备18025161号","京公网安备 11010202010353号","北京北京","4000-555-996","service@iecwww.com","https://beian.miit.gov.cn","https://www.beian.gov.cn/portal/registerSystemInfo?recordcode=11010202010353","IEC，IEC国际，IEC国际环境，IEC国际环境建设，IEC国际环境建设网，International environment construction，IEC项目案例，IEC设计专辑，IEC品牌机构，IEC企业资质，IEC项目导航，IEC项目获奖，IEC求职招聘，IEC设备建材，IEC高新科创，IEC邀约合作，IEC获奖指南，IEC新闻资讯，IEC个人求职，IEC企业招聘，IEC特价建材，IEC资源对接，IEC项目邀约，IEC项目合作，IEC供应链，IEC国际供应链，IECVIP会员，IEC入驻会员，IEC战略合伙人，IEC城市合伙人，IEC赋能峰会，IEC国际赋能峰会，IEC分享会，IEC国际合作会议，IEC战略合作，IEC注册登录，IEC个人中心，IEC会员中心，IEC运营中心，IEC服务中心，IEC推广中心，IEC邀请好友，IEC动态圈，IEC商学院，IEC搜索，规划设计，地产规划，乡镇规划，产业规划，旅游规划，景观规划，村庄规划，城市更新，城市设计，农业规划，保护规划，建筑设计，办公会议，酒店会所，旅游民宿，康养医疗，文化体育，科研教育，展览展示，餐饮娱乐，接待中心，综合商业，工业，交通，住宅，别墅，样板间，装配式设计，照明设计，BIM设计，智能化设计，休闲娱乐，既有建筑改造与更新，古建遗址，生态建筑，景观设计，环境提升，市政绿化，旅游度假，生态绿化，产业园区，住宅庭院，游乐场，景区，公园，道路设计，桥梁设计，电力管线设计，给排水管网设计，项目咨询，项目建议书咨询，可研报告咨询，造价咨询，项目全过程咨询，勘察企业，建筑勘察，岩土勘察，工程勘察，勘察测绘，检测鉴定，品牌策划咨询，设计咨询，设计企业，设计院，招标代理，咨询企业，建筑业企业，建筑业企业施工总承包资质，建筑业企业专业承包资质，建筑工程施工总承包，公路工程施工总承包，铁路工程施工总承包，港口与航道工程总承包，水利水电工程施工总承包，电力工程施工总承包，矿山工程施工总承包，冶金工程施工总承包，石油化工工程施工总承包，市政公用工程施工总承包，通信工程施工总承包，机电工程施工总承包，地基基础工程专业承包，起重设备安装工程专业承包，预拌混凝土专业承包，电子与智能化工程专业承包，消防设施工程专业承包，装饰装修专业承包，工程勘察综合资质，工程勘察专业资质，工程勘察劳务资质，工程设计综合资质，工程设计行业资质，工程设计专业资质，建筑工程设计事务所，工程设计专项资质，招标代理机构资质，造价咨询企业资质，展览工程，展览工程设计施工一体化资质，展览工程资质，城乡规划编制资质，工程咨询资信单位资质，质量检测机构，水利工程质量检测，安全生产许可证，博物馆陈列展览资质，测绘单位，土地规划机构资质，BIM施工应用，装修工程，劳务分包，智能化工程，道路工程，设备工程，水利水电工程，监理企业，建筑部监理，交通部监理，水利部监理，设计与施工一体化企业，建筑智能化工程设计与施工，消防设施工程设计与施工，建筑装饰装修工程设计与施工，建筑幕墙工程设计与施工，灯光亮化，喷泉水系，法律顾问，财务顾问，工程检测，建筑材料，装饰材料，家具，招标预告，招标公告，中标结果，流标公告，拟在建项目，业主直招，国际室内设计大奖，金堂奖，筑巢奖，红棉奖，芒果奖，金案奖，金树奖，金住奖，环球人居设计大奖，梁思成建筑奖，红点奖，普利兹克建筑奖，金块奖，詹天佑奖，鲁班奖，美国LEED绿色建筑认证，中国建筑工程装饰奖，长城杯，白玉兰奖，中国建筑学会，艾景奖，创新杯BIM应用大赛，新品推荐，建筑业企业名录查询，建筑业企业资质名单查询，设计甲级，施工一级，监理甲级，咨询甲级，招投标甲级","IEC国际环境建设（International environment construction），简称IEC。IEC国际环境建设是环境建设互联网门户网站，集设计、勘察、咨询、施工、材料、设备于一体，致力于让企业、团队、人才共享共赢，共同发展的环境建设专业互联网平台。IEC国际环境建设平台为环境建设行业各专业领域的企业、团队、人才，量身打造专业专属互联网模板，在平台上实现信息互联互通，实时更新，是资源共享、专业互补、高效便捷的合作平台，也是环境建设行业全产业链互联网大数据平台。主要核心服务有：项目案例、设计专辑、品牌机构、企业资质、项目导航、项目获奖、求职招聘、设备建材、高新科创、邀约合作等十大版块。","周一到周五09:00-18:00","IEC官方客服","https://www.iecwww.com/uploads/20210727/c549a9e212ab5c7a84f1d069b91f5544.png","京B2-20222776","https://dxzhgl.miit.gov.cn/dxxzsp/xkz/xkzgl/resource/qiyechaxunX.jsp?num=%25E5%258C%2597%25E4%25BA%25AC%25E5%258D%258E%25E5%259F%258E%25E8%25BF%259C%25E5%25A4%25A7%25E5%259B%25BD%25E9%2599%2585%25E5%259F%258E%25E5%25B8%2582%25E8%25A7%2584%25E5%2588%2592%25E4%25BA%25A7%25E4%25B8%259A%25E5%258F%2591%25E5%25B1%2595%25E8%2582%25A1%25E4%25BB%25BD%25E6%259C%2589%25E9%2599%2590%25E5%2585%25AC%25E5%258F%25B8&type=xuke","/www/wwwroot/main.iecwww.com/public","5","IEC",[314,318,322,326,330,334,338,342],{"id":315,"name":316,"img":317},1168,"Solar Term料理融合餐厅，汕头 / 建筑","https://www.iecwww.com/uploads/image/20221020/9088bc9b25260b949360b58185fc8900.jpeg",{"id":319,"name":320,"img":321},1167,"GXG武汉旗舰店，武汉/室内","https://www.iecwww.com/uploads/image/20221020/f9ec91b8600e211d4bc7db1318b954b5.jpeg",{"id":323,"name":324,"img":325},1166,"得意日式铁板料理餐厅，广州 / 建筑","https://www.iecwww.com/uploads/image/20221018/f3e437f64a0031255f206adb23fb5fb4.jpeg",{"id":327,"name":328,"img":329},1165,"石窟与云 Sushi Hanzo，深圳 / 室内","https://www.iecwww.com/uploads/image/20221018/23fe5ca468c59ab0bcb09e1ff6f5e0b0.jpeg",{"id":331,"name":332,"img":333},1164,"雅达剧院，江苏 / 建筑","https://www.iecwww.com/uploads/image/20221018/f4e5805b0b2b77c18aa93a628ff0bc3a.jpeg",{"id":335,"name":336,"img":337},1163,"苫也·未名海，深圳 / 建筑","https://www.iecwww.com/uploads/image/20221014/d987cf1e8618e3318cde92eed4caafb2.jpeg",{"id":339,"name":340,"img":341},1162,"苫也·不若林，深圳 / 建筑","https://www.iecwww.com/uploads/image/20221012/e2769375adb3b9caafebc01984abc1e4.jpeg",{"id":343,"name":344,"img":345},1161,"深圳市莲塘口岸，深圳 / 建筑","https://www.iecwww.com/uploads/image/20221010/169bf8d59f6ebe9ab5a7fc23f1ded9e8.jpeg",{"total":347,"per_page":348,"current_page":11,"last_page":349,"data":350,"recommend":407},8,4,2,[351,367,378,392],{"id":352,"name":353,"name_md5":354,"joint_designer_ids":9,"prize_id":238,"prize_desc":9,"prize1":9,"prize2":9,"prize3":355,"designer_id":239,"cases_classify_pid":240,"cases_classify_id":241,"cases_architecture_id":240,"cases_style_id":11,"content_imgs":243,"cover":356,"recommend_status":349,"collect_num":238,"is_white_list":11,"province":357,"city":358,"create_time":359,"update_time":360,"visit":238,"description":243,"keyword":243,"designer":361,"cases_architecture":20,"cases_style":279,"cases_classify":365,"create_timestamp":366,"prize":9},1544,"国际能源革命科技创新园A区建设项目，大同/建筑","33e11d0815ad77fee248399e99b70dbc","107","https://www.iecwww.com/uploads/image/20230523/1754f54bcd674d65a916063729fca95f.jpeg","140000","140200","2023-05-23 09:54:31","2024-04-23 10:39:02",{"type":349,"show_name":255,"show_cover":362,"show_agency_logo":363,"is_show":11,"status":11,"designer_id":239,"province_text":364,"city_text":364,"area_text":364},"https://www.iecwww.com/uploads/image/20211221/202112211316280099ALBM4OMHLUjgcY.jpg","https://www.iecwww.com/uploads/image/20220421/202204211628166392w3c2JDrFP3Y8Vk.jpg",false,[24,281],1684806871,{"id":368,"name":369,"name_md5":370,"joint_designer_ids":9,"prize_id":238,"prize_desc":9,"prize1":371,"prize2":9,"prize3":355,"designer_id":239,"cases_classify_pid":240,"cases_classify_id":241,"cases_architecture_id":240,"cases_style_id":11,"content_imgs":243,"cover":372,"recommend_status":349,"collect_num":238,"is_white_list":11,"province":274,"city":275,"create_time":373,"update_time":374,"visit":238,"description":243,"keyword":243,"designer":375,"cases_architecture":20,"cases_style":279,"cases_classify":376,"create_timestamp":377,"prize":9},1540,"北京冬奥村人才公租房，北京/规划","a433e9d6d913444f54286b9071d2e219","35","https://www.iecwww.com/uploads/image/20230522/01cbfa713ae7dc5767d84f7cc0698038.jpeg","2023-05-22 15:17:34","2024-05-22 14:28:49",{"type":349,"show_name":255,"show_cover":362,"show_agency_logo":363,"is_show":11,"status":11,"designer_id":239,"province_text":364,"city_text":364,"area_text":364},[24,281],1684739854,{"id":343,"name":344,"name_md5":379,"joint_designer_ids":9,"prize_id":238,"prize_desc":9,"prize1":9,"prize2":9,"prize3":9,"designer_id":100,"cases_classify_pid":240,"cases_classify_id":241,"cases_architecture_id":380,"cases_style_id":11,"content_imgs":243,"cover":345,"recommend_status":11,"collect_num":238,"is_white_list":11,"province":381,"city":382,"create_time":383,"update_time":384,"visit":238,"description":243,"keyword":243,"designer":385,"cases_architecture":389,"cases_style":279,"cases_classify":390,"create_timestamp":391,"prize_name":9,"prize":9},"225247894a99205a5925ffb1b916cb6c",3,"440000","440300","2022-10-10 17:23:58","2024-04-23 10:39:33",{"type":349,"show_name":386,"show_cover":387,"show_agency_logo":388,"is_show":11,"status":11,"designer_id":100,"province_text":364,"city_text":364,"area_text":364},"深圳市华阳国际工程设计股份有限公司","https://www.iecwww.com/uploads/image/20211224/202112241654176634l1zTVzOtMzKNcu.jpg","https://www.iecwww.com/uploads/image/20220424/202204241023268542ipDxIWCwqGJZAV.jpeg","商业建筑",[24,281],1665393838,{"id":393,"name":394,"name_md5":395,"joint_designer_ids":9,"prize_id":238,"prize_desc":9,"prize1":9,"prize2":9,"prize3":9,"designer_id":396,"cases_classify_pid":240,"cases_classify_id":241,"cases_architecture_id":11,"cases_style_id":11,"content_imgs":243,"cover":397,"recommend_status":11,"collect_num":238,"is_white_list":11,"province":398,"city":399,"create_time":400,"update_time":277,"visit":238,"description":243,"keyword":243,"designer":401,"cases_architecture":278,"cases_style":279,"cases_classify":405,"create_timestamp":406,"prize_name":9,"prize":9},520,"中国太平洋人寿保险南方基地建设项目，长沙/建筑设计","6a6f326242e67feb54339d59e8718718",340,"https://www.iecwww.com/uploads/image/20220310/40fb6c5034e5dda3b7f4a84513c28ca8.jpeg","430000","430100","2022-03-10 10:39:17",{"type":349,"show_name":402,"show_cover":403,"show_agency_logo":404,"is_show":11,"status":11,"designer_id":396,"province_text":364,"city_text":364,"area_text":364},"湖南建工集团装饰工程有限公司","https://www.iecwww.com/uploads/image/20220114/202201141511383745ZzsOIyc2ftlljP.jpg","https://www.iecwww.com/uploads/image/20220114/202201141505577374kTOoZpTTtk2vSQ.jpg",[24,281],1646879957,[408,412,416,420,424,428,432,436],{"id":409,"name":410,"img":411},4266,"疗愈之家，韩国 / JK-AR","https://www.iecwww.com/uploads/images/20260611008/20260611008001.jpg",{"id":413,"name":414,"img":415},4265,"Eco住宅，墨西哥 / Sensacional Dinamica Mexicana","https://www.iecwww.com/uploads/images/20260611007/20260611007001.jpg",{"id":417,"name":418,"img":419},4264,"谷仓中的盒子，捷克 / Facha architekti","https://www.iecwww.com/uploads/images/20260611006/20260611006001.jpg",{"id":421,"name":422,"img":423},4263,"Sidra玻璃系列与SIT/LIT家具系列，意大利 / LIT STUDIO","https://www.iecwww.com/uploads/images/20260611005/20260611005001.jpg",{"id":425,"name":426,"img":427},4262,"钢琴与小提琴之家，西班牙 / ENDALT Arquitectes + Josep Eixerés","https://www.iecwww.com/uploads/images/20260611004/20260611004001.jpg",{"id":429,"name":430,"img":431},4261,"pignic浅草店，日本 / KAMITOPEN","https://www.iecwww.com/uploads/images/20260611003/20260611003001.jpg",{"id":433,"name":434,"img":435},4260,"Beymen Tersane百货商店，土耳其 / OMA","https://www.iecwww.com/uploads/images/20260611002/20260611002001.jpg",{"id":437,"name":438,"img":439},4259,"Doverodde庄园美术馆与自然村，丹麦 / Reiulf Ramstad Arkitekter","https://www.iecwww.com/uploads/images/20260611001/20260611001001.jpg"]