糯扎渡水电站,云南/设计

2022-07-11 10:55:20其他设计,其他设计,办公建筑 , 现代风格
项目标签
项目名称
糯扎渡水电站
文章分类
其他设计
项目地址
云南
建筑师
张宗亮
建成年份
2014

糯扎渡水电站工程投资610亿元,心墙堆石坝坝高261.5m,是我国最高、世界第三高土石坝。电站装机5850MW,库容237亿m3。工程于2006年1月开工,2012年8月首批机组投产发电,2016年5月通过竣工验收。

 

Nuozhadu Hydropower Station project has an investment of 61billion yuan. The core rockfill dam is 261.5m high, which is the highest earth rock dam in China and the third highest in the world. The power station has an installed capacity of 5850mw and a storage capacity of 23.7 billion m3. The project was started in January 2006, the first batch of units were put into operation in August 2012, and passed the completion acceptance in May 2016.

 

 

 

2013年蓄水至正常蓄水位后,经过5次洪水期考验,工程运行良好。工程渗漏量最大为15 L/s,为国内外同类工程最小。

 

After impounding to the normal pool level in 2013, the project operated well after five flood periods. The maximum leakage of the project is 15 l/s, which is the smallest of similar projects at home and abroad.

 

 

 

工程在人工碎石掺砾石土料筑坝技术、“数字大坝”系统研发与应用、消力塘护岸动边界底板的新型结构形式等方面取得了系列创新成果,注重节能、节地、节水、节材和环境保护,社会经济环境效益显著,荣获“国际里程碑工程奖”,得到国际工程界的高度认可。

 

The project has made a series of innovative achievements in the dam construction technology of artificial gravel mixed with gravel soil, "digital dam" system research and development and application, and the new structural form of the dynamic boundary bottom plate of the stilling pond revetment. It pays attention to energy conservation, land conservation, water conservation, material conservation and environmental protection, and has remarkable social, economic and environmental benefits. It has won the "international milestone project award", which is highly recognized by the international engineering community.

 

 

2018年6月3日,糯扎渡水电站工程荣获第十五届中国土木工程詹天佑奖颁奖。

 

On June 3, 2018, Nuozhadu Hydropower Station won the 15th China Civil Engineering Zhan Tianyou award.

 

基础信息

地点:云南思茅(普洱)

河流:澜沧江

坝高H(m):261.5

坝长H(m):627.87

长高比L/h:2.4

正常蓄水位(m):812

坝顶高程(m):821.5

坝坡上游:01:01.9

坝坡下游:01:01.8

坝料类型:心墙坝

坝料岩性:花岗岩、角砾岩

地震(烈度/动加速度):Ⅷ°/9° 379.9gal

库容(亿m3):237.73

装机容量(MW):5850

泄洪量(m3/s):37532

建库目的:H

开工年份:2008

建成年份:2014

 

Basic information

Location: Simao, Yunnan (Pu'er)

River: Lancang River

Dam height h (m): 261.5

Dam length H (m): 627.87

Length height ratio l/h:2.4

Normal pool level (m): 812

Dam crest elevation (m): 821.5

Upstream of dam slope: 01:01.9

Downstream of dam slope: 01:01.8

Dam material type: Core Dam

Lithology of dam material: Granite and breccia

Earthquake (intensity / dynamic acceleration): Ⅷ ° /9 ° 379.9gal

Storage capacity (100 million m3): 237.73

Installed capacity (MW): 5850

Flood discharge (m3/s): 37532

Purpose: H

Year of commencement: 2008

 

Year of completion: 2014