厦门轨交2号BIM,厦门/市政
厦门轨交2号线马奎中心站是由中交一公局集团厦门公司承建,是东南地区最大的地下三层岛式车站。
Makui central station of Xiamen Rail Transit Line 2 is constructed by Xiamen Company of CCCC first highway group. It is the largest underground three storey Island Station in Southeast China.

1.通过对项目的设计变更、质量、进度、安全和成本的审批管理,可实现以项目为主体的流程化管理,同时支持BIM模型与流程的关联互查。
1.Through the approval management of project design change, quality, progress, safety and cost, the process management with the project as the main body can be realized, and the correlation and mutual check between BIM model and process can be supported.


2. Mobile terminal function.


3.通过手机端和移动端日常办公
3. Daily office through mobile terminal and mobile terminal.


4.通过BDIP会议日程规划一周的工作安排,可以实时提醒每天需要完成的工作,提高工作效率,也可以发布会议通知;可以提前查看领导的日程安排,合理安排会议时间,将会议的内容时间传达给相应需要到会的领导和同事,平台还会在开会之前进行短信提醒。
4. Through the bdip meeting schedule, the work arrangement of a week can remind the work to be completed every day in real time, improve work efficiency, and issue meeting notice; You can check the schedule of leaders in advance, reasonably arrange the meeting time, convey the content and time of the meeting to the corresponding leaders and colleagues who need to attend the meeting, and the platform will send SMS reminders before the meeting.


5. Customize the development platform according to the demand, count the overtime number of different types of work in different time periods through the statistical table of construction personnel every night, and finally collect and summarize it into the monthly overtime column and broken line statistical chart; Intuitively display the fluctuation of overtime. Update every day, and the histogram and line chart will be updated accordingly. It effectively reflects the changes of personnel in the construction process and provides strong support for the construction progress and personnel scheduling.


专家们耗尽心血,最终用BIM技术形成了设计三维模型,这已是国内地铁建设史上的一次突破。之后,在施工阶段,专家们还要将设计模型转换为施工三维模型,24个车站分批次完成,每批次大约要花上68天。
The experts exhausted their efforts and finally formed the design three-dimensional model with BIM Technology, which is a breakthrough in the history of domestic subway construction. After that, in the construction stage, the experts will also convert the design model into a three-dimensional construction model. 24 stations will be completed in batches, and each batch will take about 68 days.
施工阶段,BIM的技术运用就更加具象了。比如,施工单位每天干什么活,由谁来干,都可以通过BIM应用管理平台来派发作业单,并由施工单位把人员信息、设备信息与模型进行关联,甚至还能和门禁系统关联。
In the construction stage, the application of BIM Technology is more concrete. For example, the construction unit can distribute the work order through the BIM application management platform, and the construction unit can associate the personnel information and equipment information with the model, and even with the access control system.
“谁进入现场都可以显示出来,避免施工人员扎堆,也便于人员管理。”魏锦地说,每人完成的工作量都可以关联到车站模型中,达到施工进度可视化,帮助施工单位合理安排工期。再比如,地铁建设中使用的是临时电力设施,就存在临时设施和正式的设施交叉设置的问题,“如果没有BIM技术,临时设施只能做一段拆一段,而BIM技术运用后,就可以标注临时设施位置,等工程全部完成后再统一拆除。”
"Anyone who enters the site can be displayed to avoid the accumulation of construction personnel and facilitate personnel management." Wei Jindi said that the workload completed by each person can be related to the station model to achieve the visualization of construction progress and help the construction unit reasonably arrange the construction period. For another example, temporary power facilities are used in subway construction, which has the problem of cross setting of temporary facilities and formal facilities. "If there is no BIM Technology, temporary facilities can only be demolished one section at a time, and after the application of BIM Technology, the location of temporary facilities can be marked, and then demolished uniformly after the project is completed."
在魏锦地看来,BIM技术的运用不仅可实现标准化施工,提升施工安全性,还可以减少材料浪费。未来,若熟练运用BIM技术,将可以缩短20%左右的施工工期。
In Wei Jindi's view, the application of BIM Technology can not only realize standardized construction, improve construction safety, but also reduce material waste. In the future, if BIM Technology is skillfully used, the construction period can be shortened by about 20%.
厦门地铁2号线项目《地铁施工BIM 信息化技术创新应用研究》荣获“交通BIM工程创新奖”三等奖!
Xiamen Metro Line 2 project "Research on innovation and application of BIM information technology in metro construction" won the third prize of "transportation BIM Engineering Innovation Award"!

项目信息
项目名称:厦门轨交2号BIM和BIM平台应用
设计团队:中交一公局集团厦门公司
文章分类:建筑设计-BIM设计
设计公司:毕埃慕
项目地址:厦门
项目规模:见下文图片
Project information
Project Name: Xiamen rail transit No. 2 Bim and BIM platform application
Design team: Xiamen Company of CCCC First Highway Engineering Group
Article category: Architectural Design BIM design
Design company: biemu
Project address: Xiamen
Project scale: see the following picture